As-built drawings record what was actually installed, not just what was designed — the two rarely match once a project is on site. They become the reference document for operation and maintenance, so accuracy matters more than almost anywhere else.
Facilities teams rely on as-built drawings for years after a project completes. Getting them accurate at handover avoids costly guesswork during future maintenance or refurbishment work.