As-built drawings record what was actually installed, not just what was designed — the two are rarely identical once a project is on site. These become the reference document for the building's operation and maintenance for the rest of its life, so accuracy matters more here than almost anywhere else.
Facilities teams rely on as-built drawings for years after a project completes. Getting them accurate at handover avoids costly guesswork during future maintenance or refurbishment work.